Sometimes life throws you a curve,

We're here to straighten it out.

This was an emergency move-in situation with a severe water and pet damage issue throughout two bedrooms.
Before remediation and repair of secondary bedroom

The owner opted for a uniform flooring, so we removed 2 layers of soaked particle board underlayment and carpet, then repaired damaged subfloor before moving on to the glow up.
Before remediation and repair of a carpeted primary bedroom

After installing new underlayment, we installed a beautiful LVP in a herringbone pattern, connecting both bedrooms and the hallway in-between.
After complete floor system repair in secondary bedroom

Drywall repair was necessary at several locations due to pet damage and moisture wicking, followed by repairing two door jambs and finishing off the new flooring with fresh trim.
Completing secondary bedroom
Completed primary bedroom

Our Client opted to leave closet door replacement for anther time, as all work was taking place as the family was moving in, and all doors were custom sizes.

The resulting space was welcoming and clean, ready for each room to get a fresh coat of their preferred color.

We always strive to make these types of surprises seamless and smooth for our clients, and this was no exception. Each stage was completed as quickly as possible. We moved furniture from on side of the room to the other multiple times to get this done, leaving each family member with a functional space at the end of the day.

Likewise, when tragedy strikes in your home, we will leave your space as usable as possible before we leave each day. If you have one bathroom, this means if at all possible, you'll have a clean sturdy floor with a mounted and functioning toilet, regardless of the depth of repairs we need to undertake.

Get in touch to start your journey